CO RT 59 over CREEK

0.2 MI N DEKALB CO LINE · County 071, Alabama · Built 1936 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
001463
Year Built
1936
Length
11 m (36.1 ft)
Max Span
5.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$341,000
Total Project Cost
$375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.