JC 4 over WILLIAMS CREEK

1.8 MI N MT NEBO CHSR 65 · County 071, Alabama · Built 1935 · 2 Lanes · 38 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001183
Year Built
1935
Length
12.2 m (40 ft)
Max Span
4.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
38
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$324,000
Total Project Cost
$356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.