MT. TABOR ROAD over CEDAR CREEK

2.5 MI S SR 36 · County 103, Alabama · Built 1930 · 2 Lanes · 960 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000846
Year Built
1930
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
960
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$267,000
Total Project Cost
$294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.