AL-17 over Clear Creek

3.1 MI S of Millport · County 075, Alabama · Built 1929 · 2 Lanes · 2,330 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000620
Year Built
1929
Length
6.4 m (21 ft)
Max Span
3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,330
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.